Submitted by Luke on Wed, 08/04/2021 - 15:49
The fight to stop Enbridge's Line 3 tar sands pipeline from crossing Ojibwe lands and potentially destroying the wild rice beds has seriously heated up. For the past week, direct action every day has forced halt after halt to construction, notably stopping Enbridge from "pulling back" pipe under the river by locking to a drilling rig. In response, police have escalated to rubber bullets, chemical weapons, and even rearrests of just released water protectors. There were 19 arrests just on August 4th as water protectors made their stand on the Thief River.
Lockdown blocks drilling under river on July 29